Projects to Bid

Burlington, MA – Mill Pond Water Treatment Plant PFAS Treatment Upgrades Contract 1 – Pipe Coring, Connections and Valves

Project Status:
Inactive
Project Location:
Burlington, MA
General Bids Due:
Bid Opening Location:
11/24/2021 1:00 pm
Online Plan Room
Project Owner:
Town of Burlington
Engineer's Estimate:
$275,000
Description:

Installation of pipe stubs and valves through portions of the structure of the existing Mill Pond water treatment plant. Excavation is required to expose walls where cores are proposed through which pipe stubs will be installed. Coring will be through concrete and rebar within the existing filter channel, clearwell, and waste tank and installing ductile iron pipe stubs for future connections to a PFAS Treatment Building (to be constructed under a separate contract). This project will also includes insertion valves, exploratory test pitting, and installation of erosion control measures, and management of soils excavated as part of the work.

Project Engineer:
WP Project Number:
Collin Stuart, P.E.
20813F
Directions to download or purchase paper copy sets.
  • Follow the hyperlink to the project provided at the end of the project information.
  • First time users will need to register for a FREE account.
    • If you have not previously registered, click on Create New Company.
    • Fill out the forms and Create user Account.
    • You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
  • You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
  • If downloading, click on View Download Queue and then Proceed to Download.

BIDDING QUESTIONS?

Connect with us!

Please fill out the form below to get in touch regarding questions on any of our active bids. A member of our team will reach out to you soon.

  • This field is for validation purposes and should be left unchanged.