Fryeburg, ME – Route 302 Water Main Replacement
Project Status:
Inactive
Project Location:
Fryeburg, ME
General Bids Due:
Bid Opening Location:
07/24/2020 2:00 pm
Wright-Pierce, 11 Bowdoin Mill Island, Suite 140, Topsham, Maine 04086
Project Owner:
Fryeburg Water Company
Engineer's Estimate:
$800,000
Description:
Replacement of approximately 3,200 linear feet of water main on US Route 302 from Oxford Street to Bridgton Road. This replacement will be in conjunction with a major MDOT reconstruction project. The existing water main is asbestos cement pipe and will be replaced with 12-inch PVC pipe, along with associated valves, hydrants and service lines. The Contractor shall install materials purchased by the Owner. Owner shall purchase water main pipe and fittings, hydrant assemblies, valves, service pipe, curb stops, corporation stops, tracer wire, valve and service boxes, and pipe adapters.
Pre-Bid Conf. Date:
Pre-Bid Conf. Location:
7/8/2020 10: 00 AM (Not Mandatory)
Intersection of Route 5 and Route 302
Project Engineer:
WP Project Number:
Collin Stuart
20343
Online Plan Room:
Directions to download or purchase paper copy sets.
- Follow the hyperlink to the project provided at the end of the project information.
- First time users will need to register for a FREE account.
- If you have not previously registered, click on Create New Company.
- Fill out the forms and Create user Account.
- You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
- You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
- If downloading, click on View Download Queue and then Proceed to Download.
BIDDING QUESTIONS?
Connect with us!
Please fill out the form below to get in touch regarding questions on any of our active bids. A member of our team will reach out to you soon.