Projects to Bid
Hillsborough, NH – 2022 Water Main Replacement
2022 Water Main Replacement project which includes the replacement of approximately 2,050 feet and 1,200 Feet of 2-inch polyethylene water main with 2-inch HDPE water main along Ellen Brook Road and Old Lantern Road, respectively. In addition, the following streets will be considered as Additive
Alternates to the project; replacement of 950 feet, 1,850 feet, 1,400 feet, 900 feet, 1,000 feet, 1,150 feet, 3,150 feet, 650 feet, and 2,750 feet of 2-inch/3-inch PVC/Polyethylene water main with 2-inch HDPE piping along Bobolink Lane, Deerpoint Drive, Racoon Alley, Skyview Lane, Turtle Bridge Crossing, Moccasin Trail, Winter Road, Birch Tree Lane, and Autumn Road, respectively. The work includes the installation of water mains, fittings and appurtenances, services (to the property line), valves, flushing hydrants, temporary water, erosion controls, and traffic control. A final Additive
Alternate includes the installation of a meter pit at each residence in the base bid.
- Follow the hyperlink to the project provided at the end of the project information.
- First time users will need to register for a FREE account.
- If you have not previously registered, click on Create New Company.
- Fill out the forms and Create user Account.
- You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
- You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
- If downloading, click on View Download Queue and then Proceed to Download.
BIDDING QUESTIONS?
Connect with us!
Please fill out the form below to get in touch regarding questions on any of our active bids. A member of our team will reach out to you soon.