Projects to Bid
Ware, MA – Bank Street Road Reconstruction
The work consists of furnishing of all labor, equipment and materials required for the reconstruction of approximately 450 linear feet of Bank Street from Pleasant to High Streets respectfully. The scope of work includes but is not limited to the removal and replacement of water main, sewer trunkline, installation of new drainage structures, storm drainpipe, water & sewer service connections, new fire hydrant, installation of granite curb, bituminous curb, timber guard rail, sidewalks and full depth roadway cross section. The project scope also includes new sewer main and sewer service connections on a portion of Park Avenue to North Street. Driveway aprons and minor site elements at the interface with private residences is included within the scope. Project schedule anticipates construction to begin Fall 2021 and continue through Summer 2022 due to potential construction material shortages. If temporary water is left in place through a Winter recess, it is contractor’s responsibility to maintain frost protection at all times.
- Follow the hyperlink to the project provided at the end of the project information.
- First time users will need to register for a FREE account.
- If you have not previously registered, click on Create New Company.
- Fill out the forms and Create user Account.
- You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
- You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
- If downloading, click on View Download Queue and then Proceed to Download.
BIDDING QUESTIONS?
Connect with us!
Please fill out the form below to get in touch regarding questions on any of our active bids. A member of our team will reach out to you soon.