Projects to Bid
Weston, MA – Sherburn Circle Culvert Replacement Project
The proposed project is replacement of the existing precast concrete culvert at the crossing of Sherburn Circle and Bogle Brook with a new 9’ wide x 4’-8” high x 34’ long precast concrete box culvert. Work associate with this project includes mobilization, temporary traffic controls, temporary dewatering & brook bypass, demolition of the existing culvert, installation of new water main, new box culvert with large segment block headwalls, restoration of natural stream bed, installation of new gas main, repaving & reconstruction of the road & associated infrastructure, and landscaping. The full project scope is depicted on the Construction Drawings prepared by Wright-Pierce.
Bidders may obtain bid documents online at www.weston.org/bids.
- Follow the hyperlink to the project provided at the end of the project information.
- First time users will need to register for a FREE account.
- If you have not previously registered, click on Create New Company.
- Fill out the forms and Create user Account.
- You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
- You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
- If downloading, click on View Download Queue and then Proceed to Download.
BIDDING QUESTIONS?
Connect with us!
Please fill out the form below to get in touch regarding questions on any of our active bids. A member of our team will reach out to you soon.